What to Specify Before Accepting a Deck Quote

A deck quote should describe the finished work, not just an area and a board price. We connect material choices with the support system, access and finishing. This checklist explains how we define a repair, reboarding job or new deck for your Canberra home before you accept the proposal.

We can help with:

Start with repair, reboarding or new construction

We first establish the work your deck needs. Local repair replaces defined damaged boards or components. Reboarding renews the walking surface over framing assessed as suitable to retain, with support repairs specified where needed. New construction or a rebuild defines the footprint and supporting structure as well as the surface.

Cleaning and oiling are a separate surface-care stage. We can include them with repairs, but they do not replace work to damaged timber or connections. Our deck repair service assesses an existing defect; deck building and extensions covers a new layout. The repair-or-rebuild guide explains that decision.

Name the selected boards and fixing approach

We record the timber species or selected composite system, board profile, width and thickness, and the intended board layout. Wider boards, a different species or a concealed fixing system are choices to assess with the product and site; none alone describes the complete construction.

We check the selected board requirements against the support layout and compatible fasteners. A change in board product can affect joist spacing, joints, edging and supply, so we resolve it before installation. Our timber and composite comparison separates those product and maintenance decisions.

The construction checklist in our proposal

Joists sit directly beneath the boards; bearers support the joists, and posts carry the supported frame to its footings. We identify these parts separately so “new decking” is clear about both the surface and what holds it up.

Deck quote scope checklist
ItemWhat we specify
Decking boardsSelected timber or composite product, profile, dimensions, layout and the area or boards being replaced.
Joists and bearersWhich supports stay, which are repaired or replaced, and the required new framing and house connections.
Posts and footingsRetained and new supports, assessed condition and the ground or footing work included.
Fixings and connectorsBoard fasteners, framing brackets and connections compatible with the selected materials and exposure.
Steps and railingsTheir locations and the work included, along with edges, landings and connections to retained areas.
Working accessMaterial entry, underside access, protection, equipment and any agreed opening-up.
Dismantling and disposalThe old boards or structure removed, items retained or refitted, and waste handling.
Surface conditionPreparation, any sanding, primer, oil or coating, the selected area and the condition at handover.
Unseen work and changesFurther inspection needed and how findings, revised scope and price are agreed before extra work.

Agree where the finishing starts and stops

Replacement boards and weathered retained timber may look different. We confirm the material and intended finish with you, including whether preparation and coating cover the repaired patch or a wider area. An unfinished board installation and a prepared, coated deck have different work included.

Where surface care is part of the job, we plan preparation, drying and use around the selected product and suitable weather. Deck cleaning and oiling has its own scope; the quote states how that stage joins the construction work.

Discuss extensions or a roof during the first measure

If you expect to extend the deck, change the stairs or add a roof later, tell us when we discuss the initial layout. We can assess how the proposed stages affect supports, connections, edges, drainage and access, then identify design or approval work needed for the agreed stage.

We assess an existing frame rather than assuming it can carry a future addition. The quote separates the work being built now from later options; future plans also do not replace the stairs or barriers needed for the completed current stage. For a roof over a retained pergola, our pergola timber service assesses the connected structure before alterations are defined.

Confirm the complete scope with our team

We measure the site, assess retained timber and discuss materials and use before preparing the written proposal. We identify any areas needing further access and explain how additional findings will be confirmed. This links the price to the construction we have assessed, rather than leaving “decking” open to interpretation.

Contact us with your suburb and whether the work concerns repairs, replacement boards, a new deck or an extension. Existing photos or drawings are optional. We confirm the proposed work, applicable visit arrangements and the next steps with you; discuss your deck with our team.

Deck quotes: common questions

Does a new deck quote include removing the old one?

We state the agreed dismantling, retained items and disposal in the proposal. A new-board supply price alone does not describe that work.

Can decks with the same board area have different construction costs?

Yes. Height, ground conditions, supports, house connections, stairs, access and finishing can differ. We quote those assessed components with the boards.

Can sound framing stay when the boards are replaced?

Where our assessment finds it suitable to retain, yes. We identify the retained joists, bearers, posts and connections and any support repairs needed before reboarding.

RELATED SERVICE

New Deck Construction & Extensions

We measure and build new decks and extensions across Canberra, specifying the materials, supports, connections and agreed finish.

Explore new deck construction and extensions ↗